If you've ever been handed two quotes for a Mark Andy flexo press and told to "just pick the cheaper one," you know the sinking feeling. I'm the office administrator for a 180-person company. I manage all equipment and supply ordering—roughly $340,000 annually across 11 vendors. I report to both operations and finance, which means I get it from both sides: ops wants uptime, finance wants the number under budget.

In 2023, I sat in on a vendor review for a new flexo press. The sales rep handed me two quotes for comparable machines. One was about $40,000 less than the other. My instinct—the instinct of anyone who's spent five years stretching a budget—was to flag the cheaper one as the obvious choice.

I was wrong. It took two years, three emergency part orders, and one very uncomfortable budget conversation to figure out why.

The problem you think you have (and the one you actually have)

On paper, buying a flexo press looks like buying any other piece of equipment. You get a quote, you compare specs, you pick the lowest number. That's the process most of us learned in procurement. It works fine for office printers and chairs.

It doesn't work for a Mark Andy flexo press. Or any production press, really. Because the quote is for the machine. The cost is for the system that keeps the machine running.

Here's what nobody puts on the quote: press parts availability, service response time, and UV curing system support. Those three line items, over five years, can easily dwarf the difference between two quotes.

The deeper issue: you're not buying a press, you're buying uptime

It's tempting to think you can just compare unit prices. But identical specs from different vendors can result in wildly different outcomes once the machine hits your floor. A press that's $40,000 cheaper but requires eight weeks for a replacement cylinder isn't cheaper. It's a $40,000 deposit on future downtime.

I learned this the hard way with press parts. We had a vendor—not Mark Andy—who quoted beautifully on a used press. The machine ran fine for about 14 months. Then a drive-side bearing failed. If I remember correctly, the lead time was quoted at four weeks. Actually, closer to six once the order went through the backorder queue. Six weeks of a line sitting idle while we paid overtime on a backup machine and explained delays to two major customers.

Saved $40,000 on the press. Spent close to $90,000 in overtime, expedited freight, and one customer credit. Net loss: about $50,000. That's the "cheaper option" story I now tell every time someone asks me to just compare quotes.

I still remember the conversation with our production manager. I asked him what happened when the backup line went down. He said, "We don't lose the order. We lose the next one." That line stuck with me. A press that's down doesn't just cost you the job in front of you. It costs you the customer's confidence in your next promise.

The part that surprised me: consumables logic doesn't work here

I spent years managing office equipment—HP printers, a 4x6 photo printer for our badging station, the greeting card printer HR loves. In that world, the machine is cheap and the ink gets you. You learn to check ink prices before you buy the printer. How to change ink in an HP printer becomes a monthly ritual. It's annoying, but it's contained.

Flexo presses invert the logic. The machine is expensive, but the parts and service are where the long-term relationship lives. A $200,000 press with a parts network that responds in 48 hours is a better asset than a $160,000 press with a parts network that responds in "six to eight weeks, depending on the supplier."

I didn't expect that. Turns out the office printing world trained me to look at the wrong cost.

What was true five years ago isn't true now

When I took over equipment purchasing in 2020, I had a simple rule: three quotes minimum, always. That rule made sense for office supplies. For production equipment, it's incomplete.

This was true 10 years ago when aftermarket parts networks were spotty and lead times were long across the board. Today, the gap between a well-supported press line and a poorly-supported one is bigger—not smaller. The Mark Andy ProSeries line and their Mercury UV curing system are built around the assumption that you'll need parts, service, and curing support for a decade. That's not marketing; that's a supply chain decision that shows up in your maintenance log.

The "always get three quotes" advice ignores the transaction cost of vendor evaluation and the value of an established parts relationship. I used to quote everything to three vendors, every time. Now I quote select categories to three and build depth with two. For press parts, I have one primary and one backup. That's it.

The cost of not asking the right questions

Let me be concrete about what bad press-parts support costs. I track our maintenance spend in a simple spreadsheet—I'm not an engineer, so I keep it basic. Processing 60-80 orders annually gives me a decent read on trends. Over the last 18 months, our downtime on the poorly-supported backup line ran roughly 40 hours per quarter. On the ProSeries line with a dedicated parts channel, we ran under 10 hours per quarter.

At our production rate, those 30 extra hours per quarter were worth more than the annual difference between the two press quotes. That's not a rounding error. That's a budget line I had to defend to my VP.

"The vendor who couldn't provide proper invoicing for a $900 parts order cost us $2,400 in rejected expenses once—different story, same lesson."

Before I place any order, I verify three things: invoicing capability, part availability, and response time. In that order.

How I evaluate a press quote now

Short version, because the analysis is already done:

  • Ask for a written parts availability guarantee. Not a verbal "we've got you."
  • Get the average lead time for the three most-replaced parts. If the rep can't answer, that's your answer.
  • Check UV curing system support separately. Mercury systems are reliable, but you still want to know who services them.
  • Price the first 24 months of consumables and spare parts. Not just the machine. Based on publicly listed prices for commercial printing equipment in January 2025, setup and consumables can add 25-100% to a base quote over the first two years. Flexo presses follow the same pattern.
  • Ask for two customer references who've owned the press for at least three years. Call them. Ask about parts.

That's it. The machine spec sheet is the easy part. The system behind it is the actual purchase.

Bottom line

The Mark Andy flexo press price on the quote is a starting point, not a total. If you're comparing presses on sticker price alone, you're comparing the wrong numbers. Press parts, service response, and UV curing support are where the real cost—and the real value—lives.

Trust me on this one. I learned it the expensive way.

Henrik Solberg

Henrik Solberg

Henrik Solberg is a commercial machinery safety, reliability, and procurement analyst covering display, audio, printing, sewing, cleaning, laser, welding, and supporting automation systems. He applies ISO 12100 risk-assessment principles and IEC 60300-3-3 lifecycle-costing guidance while comparing uptime, MTBF, MTTR, energy use, consumable demand, preventive-maintenance intervals, spare-parts lead time, training burden, installation constraints, and residual risk. His decision frameworks help plant managers, integrators, and procurement teams compare quotations, validate operating assumptions, plan acceptance tests, and select equipment on total delivered value.

Leave a Reply

Your email address will not be published. Required fields are marked with an asterisk.